  1. Slide the server into the rack. The retention plunger does not need to be pulled upward during installation.
    • Slide the server into the rack.

    • The retention plunger does not need to be pulled upward during installation.

    • The server is secure when the retention plunger snaps shut.

  2. Connect the 10G SFP+ cable into the network interface controller. Connect the 10G SFP+ cable into the network interface controller.
    • Connect the 10G SFP+ cable into the network interface controller.

  3. Connect the Ethernet cable to the server. Connect the Ethernet cable to the server.
    • Connect the Ethernet cable to the server.